A major milestone was achieved on the 23 April 2024 with both Murray River and Campaspe Shire Councils’ adoption of the Echuca Moama Flood Study component of the Echuca Moama Torrumbarry Flood Study and Risk Management Plan. Interactive mapping and the report is available via the link below.
View the Echuca Moama Flood Study Report
Moama Flood Risk Management Study and Plan
Council has formally endorsed the Moama Flood Risk Management Study and Plan at the July 2025 Council meeting.
The adopted Plan recommends a range of actions including flood mitigation works, updates to development controls, and improvements to local flood warning systems. These measures aim to reduce the risk and potential damage from future riverine flooding events and support responding agencies during emergencies.
The document is available for viewing below.
View the Moama Flood Risk Management Study and Plan
Moama Floodplain Management Study 2001:
The Sinclair Knight Merz (2001) Moama Floodplain Management Study has been superseded by the above adopted documents, but have been referenced in their development. The 2001 Study can still be accessed below:
Moama-Floodplain-Management-Study-SKM-Volume-1.pdf(PDF, 2MB)
Moama-Floodplain-Management-Study-SKM-Volume-2.pdf(PDF, 9MB)