A major milestone was achieved on the 23 April 2024 with both Murray River and Campaspe Shire Councils’ adoption of the Echuca Moama Flood Study component of the Echuca Moama Torrumbarry Flood Study and Risk Management Plan. Interactive mapping and the report is available via the link below.
The project team is currently working to prepare the draft Torrumbarry Flood Study and Levee Bank Assessment which we expect to be at draft stage by July 2024 and the Echuca Moama Risk Management Plan. These documents will thencomplete the overall project.
Consulting Engineers Water Technology are currently assessing the flood mitigation works identified during the January community consultation process.
View the Echuca Moama Flood Study Report
Moama Floodplain Management Study 2001:
The Sinclair Knight Merz (2001) Moama Floodplain Management Study (as per below) predates Moama Levee which was completed in 2006. It is has been provided to the general public for information only. Engineering Professional advice will be required to ascertain the extent of the impact of the town levee on the Floodplain Management Study.
Moama-Floodplain-Management-Study-SKM-Volume-1.pdf(PDF, 2MB)
Moama-Floodplain-Management-Study-SKM-Volume-2.pdf(PDF, 9MB)